Landscape Architecture Portfolio

Page 1


PORTFOLIO

DEANNA M. COWLEY

EASTERN MARKET METRO PLAZA - MARKET GARDEN PLAZA 10

HWY TO NOWHERE - WOODLAND PARK 16

WASTEWATER TREATMENT IN SUBSAHARAN AFRICA 22

PLANTATION PARK HEIGHTS

Course: Community Design Studio (Capstone)

Professor: Byoung-Suk Kweon

Year: Spring 2022

URBAN FLOWERS

The transformation of two vacant sites into working urban farms.

Location: Central Park Heights, Baltimore, MD

Size:

Project Type: Urban Agriculture, Community Engagement

Plantation Park Heights is an inter-generational volunteer work force. They produce foods and help to feed people who live in the food desert areas in Baltimore. They work with youth farmers, community members, artists, developers, academics and other important stakeholders to create the first “Agrihood” in the City of Baltimore.

The main intent was to Identify the unmet potential of the undeveloped mid-block (site two) to meet the needs of the community and Plantation Park Heights by implementing a set of goals and requirements given by the client.

Inventory and Analysis

Design Process

Site Design

ESD CALCULATION

The Environmental Site Design(ESD) calculations help to determine the total square footage of water to be treated.

I=7,298.84

Rv=0.05+(0.009(7,298.84))=65.73

PE=1

A=(60)(180)=10,800

ESD=(1)(10,800)(65.73)/12 =59,157ft2

Where the installation of a 20'x20' rain garden will treat 520ft2 of water.

view of Flower Farm

GOALS

1. Design the mid-block for its intended use as a cut flower farm.

2. Transform empty spaces into active pollinator friendly areas.

3. Safe and quite space to learn, eat, and host small scale events.

4. Implement rain garden to reduce stormwater runoff.

Patio& Deck Seati ng Areas

FarmingPlot

Flower

EASTERN MARKET METRO STATION

Course: Landscape Structures & Materials

Professor: John Wray

Year: Spring 2020

MARKET GARDEN

Redesign and rejuvenation of Eastern market Metro Station in D.C. ...

Location: Washington D.C.

Size: 47,242.63 ft 2

Project Type: Plaza

For this project1, the plaza is to be designed to accommodate the flow of both commuters as well as park & plaza visitors. It is imperative to the client that a strong connection be made into the site from the existing road and sidewalk crosswalk network.

The Eastern Market Metro Plaza, which embraces its urban context, is looking for a plaza that will become a place that welcomes a variety of activities and functions from all social and economic backgrounds. It’s important to ensure that the revitalized plaza is capable of hosting a diverse palate of activities.

1 Completed CD was a collaboration w/ others

Site Conditions

Design Objectives

1. Event amphitheater spaces for up to 100 people.

2. Tables & chairs for outdoor dining, min. 8 tables

3. Contemplative/ quiet spaces

4. Spaces designed for public art to be displayed,

5. A direct or semi-direct connection from all sides of the plaza to the entrance of Metro Station and elevator tower

6. Garden planting beds that include a diverse species of native plants that also includes a variety of plant sizes and heights including a tree canopy, under-story planting, ornamental trees, ground-covers, etc.

Comprehensive Site Planning

DETAILING THROUGH MATERIAL EXPLORATION

In our materials exploration we decided to explore the uses of slate/flagstone paver's because it was easily available to us and also a highly versatile material to work with. Using samples sourced from local suppliers (Chaney Enterprises, Ernest Meiers Annapolis, etc), and other materials at home; we experimented with different formal arrangements and textures to create detailed patterns in our pavers. The goal was to meld our new slate pavers with the original brick paving of the site cohesively, while also allowing design flexibility by using organic and rigid geometric shapes together in tandem.

Martial Conclusion

For this project, as a team, our design and understanding of space was heavily influenced by our explorations of materiality - practically driven by it. Through our use of materials and the construction documentation process, we:

1. Redefined the existing site with a distinct character of its own, while also re-establishig its connection to its surrounding contexts.

2. Shaped unique spaces within the site that offer multiple points of physical and aesthetic interest, as well as provide flexibility for opportunities for many functions.

3. Promoted sustainability and community beautification by expanding green space and a largely native plant selections.

4.Addressed community and user interests for site through inclusion of new spaces and park facilities.

THE HIGHWAY TO NOWHERE

Course: Urban Design Studio, Theory of Landscape Architecture

Professor: Jack Sullivan, Caren Yglesias

Year: Fall 2021

WOODLAND PARK

Environmental equity while establishing an ecological sensitive landscape.

Location: Harlem Park, Baltimore, MD

Size: 525,933ft2

Project Type: Urban Design

Route 40, better known as the Highway to Nowhere, sits in West Baltimore a community of disrepair. The Highway was built more than five decades ago and destroyed a predominantly African-American neighborhood. This 1- 1/2 mile stretch of road cuts through West Baltimore with its end result of dividing neighborhoods and displacing many residents and businesses, thus causing many economic hardships for the community.

My initial concept asked what if the Highway to Nowhere was transformed from an “open wound” of a six-lane road that was never finished (Collins, 2021), into a natural environment that not only provides a sense of place but is also an ecological presence of West Baltimore?

Inventory and Analysis

The overall watershed consists of about 75% impervious surfaces. The largest land use areas are Buildings, which are 100% impervious, and Grass, which is entirely previous. Watershed 263 is part of the Baltimore Harbor drainage basin. The watershed drains into a network consisting of 225,543 LF (43 miles) of storm drains, discharging through a single outlet, an 11 ft x 14 ft box culvert to the Middle Branch, part of the Patapsco river.

Considering the loss of major rivers and streams within the area many recommendations can be made based on what open space there is. The overall watershed is made up of about 30% open space. Based on the data collected for the Watershed 263 Management Plan

Final Report[1] the implementation of Extended Detention Wet Ponds/wetlands along Rout 40 would provide:

• Temporary and permanent storage

• Improve water quality

Beautification

These ponds would be located along Mount Street and Gilmore Street, Strickler Street and Calhoun Street, or Carey Street and Carrollton Avenue.

Metrics

Conceptual Planning

Design Principles

1. Environment

a. Utilized bioswales or rain gardens to improve stormwater infrastructure throughout the site

b. The use of native plant species or other plantings to establish a sustainable climate

2. Community

a. Provide open spaces that can be functional, accessible, and enjoyable for all ranging demographics

b. Establish environmental stewardship through community engagement projects

3. Economics

a. Allow for flexible outdoor space that can host a wide range of events

b. Employ mixed-use development to improve community jobs and education

"In order for Urban Ecology to successfully work both “SOCIAL AND ECOLOGICAL FACTORS must INTERACT IN THE URBAN ECOSYSTEM”[1].

SOUTH WOODLANDCOMMONS

OPEN LAWN/PR MENADE

DESIGNING SUSTAINABLE SOLUTIONS TO COMBAT CLIMATE

CHANGE

Course: Ecological Design

Professor: Peter May

Year: Spring 2022

WASTEWATER TREATMENT IN SUB-SAHARAN AFRICA

Enhancing availability of clean water in a drought ridden country.

Location: Sangari, Republic of Chad

Size: 1400ft2

Project Type: Green Infrastructure/Theory, Green New Deal

The construction of a series of bio-swales and bioretention wetlands in Sub-Saharan Africa. In a small city located just south of Lake Chad and east of the Chari river called Sangari,Republic of Chad. Despite obstacles in helping the region restore Lake Chad, there are efforts to keep the lake from drying that exist. Climate change and global temperature increase is the main driver of the shrinkage of the lake; however, there are measures to be taken to prolong the existence of Lake Chad.

This design will help in reaching the goals projected by the Green New Deal by diverting water use from a depleting body of water. Climate change has played a key role in the shrinking of Lake Chad. By implementing tools that help communities adapt to the products of climate change, we can focus our resources on combating the global problem.

Costs range around $3-5.00 per square foot with a 10% contingency fee to allow for any extra costs that might come.

Planting Selection

medium-sized 21m(69 ft)

Nitrogen fixing

Analysis

Area - 1400ft2

Climate - Arid/Dry

Approximately 10% slope

Rainfall - 50-150mm per month

Soil - leptosols, regosols, and arenosols

• Leptosols - very shallow profile depth contain large amounts of gravel.

• Regosols - shallow, medium- to fine-textured

• Arenosols -Sandy soils, lack any significant soil profile development

30 to 150 cm

Fruiting May to July

Found on sand dunes 15 ft. (4.6 m)

Thrives in lake margins, wetlands, saline environments

1.5 m (5ft) by 0.2 m (0ft 8in)

Prefers dry or moist soil

Drought tolerant

V. tortilis D. bipinnata T. aphylla P. turgidum

Carbon Calculations

5 hectares, bioretention can hold up to 1,269,997 liters of water. A person (African City) can discard between 20-150 liters of wastewater per day.

Sangari

• Consists of approximately 2500 people.

• Wastewater 20 liters per person

Total daily wastewater volume = Number of people × Wastewater produced per person

With a 23.1% reduction in total Nitrogen (N) and a 58.1% reduction in total Phosphorus (P).

Discussion

By implementing this BMP or ecological design, a small village of people are provided with greater food security, a wastewater treatment system thus mitigating disease related issues, and even help reduce pressure for water usage in a drought-stricken region. In order to have a greater impact, this type of thinking would have to be implemented at a legislative level. The human dimensions of climate change are often forgotten when resolving issues related to climate change. This ecological design project in particular was designed to contribute to a better quality of life for the people of Sangari.

Average wastewater inflow load is 50m ^3 per day

Design Implementation

Site Plan for bioretention

Results

Design considerations for Sangarai should consist of the topography, climate, and vegetation.The bioretention makes up 4,200ft2 with a total length of 120ft. In theory the system should be able to treat 1269997.46 liters of water. The use of a subsurface bioswale system allows for the onsite treatment of stormwater that can then be implemented for the use of irrigation.

Section Cut showing bioretention materials

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.
Landscape Architecture Portfolio by Deanna “ostrichrunner” - Issuu